eoPortal News - earth observation news  
Earth Observation Missions 
Research and Applications 
Policy and Legislation 
Did You Know? 
New EO Resources 
Jobs and Opportunities 
Share Your News with the EO Community 
  Earth Observation Missions
GOCE positioned for alignment check
 More Top News
 
Orbital ships NASA's Orbiting Carbon Observatory Satellite to launch site
 
RapidEye satellite constellation transmits first images
 
The European Data Relay Satellite System – EDRS
 
CHRIS satellite imager celebrates 7 years’ scientific success
 
First images received at Azore's Santa Maria station
 
 Archive  
 
Related Links
GOCE in the eoPortal
 
GOCE on the ESA portal
 
Launch diary: GOCE unpacked and alignment check complete

7 August 2008

Since its arrival at the Plesetsk Cosmodrome in northern Russia, the GOCE satellite has been unpacked, undergone a number of manoeuvres to position the 5-metre long spacecraft onto a so-called 'rotary trolley' and had the alignment of several components checked. All of which have been carried out successfully.

The alignment checks on the Ion Thruster Assembly, Star Trackers and Gradiometer outside mirror all showed the same values as those taken at ESA's test facilities in the Netherlands before shipment – confirming that nothing has been disturbed during the journey to Russia.

In addition, the Electrical Ground Support Equipment, which is essential for carrying out further testing over the next weeks, is now up and running. The next step is to move the satellite onto a multipurpose trolley and carry out a series of electrical tests. In parallel, the 'Launch Power Supply' and the 'Telemetry Rack' will be transported and installed at the launch pad.

Needless to say, with the launch campaign going well team spirits are high!

For more information click here.

Source: ESA

 
 
  Disclaimer         Contact eoPortal Last modified: 12-Aug-2008